A modernisation project of 67 km of railway line Hatrival – Luxembourg border that includes:
Infrastructure modernisation
- 5 curves
- 6 level crossing
- 27 structures in total
- 7 railway stations
Signalling subsystem
Signalling system modernisation and adaptation to higher trains speed
Energy subsystem
Dismantling existing catenary 3kV and construction of new overhead catenary system 25kV
Arbeidsomfang
NoBo Service
- Energy: interoperability assessment of the Energy subsystem according to TSI 1301/2014
- Infrastructure: interoperability assessment of the Infrastructure subsystem according to TSI Infra 1299/2014
- PRM: interoperability assessment of the PRM subsystem according to TSI Energy 1300/2014
DeBo Service
- CCS & Infrastructure : assessment of the Signalling and Infrastructure systems according to national rules