FRANCE: HIGH SPEED LINE EAST PHASE 1
Kunde
RFF
Delsystem
Prosjektets varighet
2002 to 2008
Prosjektbeskrivelse
Control and signalling (ERTMS Level 2 equipment, SEI equipment, KVB, track circuits…)
Energy (voltage/frequency, interface with substations…)
Infrastructure
Structures (Covered trenches, Viaducts, station platforms, bridges,…)
Track (risk of derailment)
Interfaces with rolling stock (crosswinds, hot box detectors, etc.)
Detection equipment (fall detectors,…)
Provisions relating to the protection of the site
Operation and maintenance
Arbeidsomfang
Prestasjoner
Se alt