ALGERIA: MOSTAGANEM TRAMWAY

Klant

Entreprise Metro d'Alger

Subsysteem

Duur van het project

2013 - ongoing

Beschrijving van het project

The first tramway line of Mostaganem, 14.2 km long, is composed of 2 sections:

  • The first section connects the “Salamandre” sector to the “Kharouba” sector, 12.2 km long and with 20 stations.
  • The second section connects the SNTF station to the new bus station, 2 km long and with 4 stations.

Omvang van het werk

The evaluation covers the following phases:

  • Phase 1: Design of the installations and manufacturing of the equipment
  • Phase 2: Manufacturing – Installation
  • Phase 3: Tests and trials
  • Phase 4: Preparation for operation
  • Phase 5: Commissioning (Safety file)
  • Phase 5.1 Partial safety file
  • Phase 5.2: Completion of the safety file
Prestaties/ Succes
Alles bekijken
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Heeft u een project?

Heeft u expertise nodig voor uw spoorwegproject?

Bent u een mobiliteitsexpert?

Sluit u zich aan bij ons team om aan innovatieve projecten te werken en samen de toekomst van mobiliteit te bevorderen.