BELGIUM: CORRIDOR C

Cliente

Infrabel

Sottosistema

Control, Command and Signalling

Durata del progetto

2011 to 2018

Descrizione del progetto

CERTIFER’s Service

  • The subsystem is an ETCS level 1 with fill-in function and is an upgrade of the existing signalling and contains TBL1 + functionality (TRU with message transmission by Eurobalises) with reciprocal influence of one system on the other as a point of attention.
  • The ETCS level 1 functions are prescribed in the FRS and SRS (SRS = subset-026 2.3.0). The ETCS LI balance assembly consists of the following hardware/components:
    • Lineside elearonic unit (LUE)
    • Fixed Eurobalise
    • Switchable Eurobalise

Certifer team

  • 1 project manager and 5 experts
  • The mission is carried out in partnership with Lloyd’s Register Rail.

Ambito di lavoro

Risultati
Vedi tutto
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Hai un progetto?

Hai bisogno di un supporto professionale per il tuo progetto ferroviario?

Sei esperto nel settore mobilità?

Unisciti al nostro team per lavorare su progetti innovativi e far progredire insieme il futuro della mobilità.