FRANCE: HIGH SPEED LINE EAST PHASE 1
Cliente
RFF
Sottosistema
Durata del progetto
2002 to 2008
Descrizione del progetto
Control and signalling (ERTMS Level 2 equipment, SEI equipment, KVB, track circuits…)
Energy (voltage/frequency, interface with substations…)
Infrastructure
Structures (Covered trenches, Viaducts, station platforms, bridges,…)
Track (risk of derailment)
Interfaces with rolling stock (crosswinds, hot box detectors, etc.)
Detection equipment (fall detectors,…)
Provisions relating to the protection of the site
Operation and maintenance
Ambito di lavoro
Risultati
Vedi tutto