BELGIUM: ACCESS LINE L3 & ACCESS L4

Cliente

Infrabel (ETCS)

Sottosistema

Control, Command and Signalling

Durata del progetto

2004 to 2009

Descrizione del progetto

Certifer’s missions :

  • ETCS level 1 trackside assembly with reopening function
  • Coherence with adjacent ETCS level 2 trackside systems
  • Integration with existing signalling system

Control of the interoperability of the signalling of the high speed lines L3 (Liège – Hammerbrùcke) and L4 (Antwerp – Frontier, Netherlands), category I lines in reference to the CC TSI. In order to study the compliance of the system behavior during Level 1 to Level 2 transitions the approach areas (about 5 km) located at the ends of L3 and L4 are part of the evaluation.

Certifer team :
1 project manager and 2 experts

Ambito di lavoro

Risultati
Vedi tutto
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Hai un progetto?

Hai bisogno di un supporto professionale per il tuo progetto ferroviario?

Sei esperto nel settore mobilità?

Unisciti al nostro team per lavorare su progetti innovativi e far progredire insieme il futuro della mobilità.