IRELAND : DUBLIN METROLINK
Client
Transport Infrastructure Ireland
Sous-système
Control, Command and Signalling, Energy, Infrastructure, Rolling Stock, Global System
Durée du projet
09.2019 -
Description
The origin of the MetroLink Scheme Project finds its roots in a social observation, stating that by 2030, 60 percent of the world’s population will live in cities.
The MetroLink Scheme will be formed by a 19-km north-south urban railway route, that will link Swords to Dublin’s city centre (Charlemont) in 25 minutes, and the city centre to Dublin Airport in 20 minutes, by mostly running underground (single bore tunnel). The MetroLink Scheme will be fully automatic (GoA 4) and will include 15 stations.
périmètre du projet
In this context, CERTIFER is involved as the Independent Safety Assessor to assess the Project compliance with CENELEC standards. CERTIFER is responsible for the assessment of the following: System-wide, Rolling Stock, Power & Systems, Civil, Structural, Fire Safety, Track, Tunneling, IT Systems & Signaling, Operations (including CBTC & OCC), Safety & Systems Integration, Human Factors, Safety & Quality Assurance.