FRANCE : METRO OF MARSEILLE (NEOMMA PROJECT)

Client

Alstom Transport

Sous-système

Control, Command and Signalling

Durée du projet

10.2020 -

Description

Marseille metro network is composed of 2 lines for 22,2 km and 29 stations. In the framework of the network modernization program (NEOMMA project) and more specifically of the renewal of trains and systems allowing a full automatic operation (GoA4) (Contract M1 – RST and Systems), Alstom offers URBALIS 400 range as CBTC solution.
The CBTC subsystem includes ATC (Automatic Train Control) on-board and trackside, ATS (Automatic Train Supervision) and STD Communication network.

The operation is planned in several stages : first in GoA2 mode for M2 line and then for M1 line, then GoA4 for M2 line and then for M1 line, each stage requiring an authorization for placing in service. The Generic Application CBTC is considered as already certified.

The commissioning of each line is planned in 2 phases between 2024 to 2026.

périmètre du projet

In this context, CERTIFER is involved as the Independent Safety Assessor for the Specific Application of CBTC to assess its compliance with CENELEC standards.

Réalisations
Voir tout
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Avez-vous un
projet ?

Avez-vous besoin d’un expert pour vous accompagner dans votre projet ferroviaire ?

Êtes-vous expert de la mobilité ?

Rejoignez notre équipe et travaillez sur des projets innovants pour faire avancer ensemble la mobilité du futur.