FRANCE: LIGHT RAIL TRAIN OF GRENOBLE
Client
SMTC Grenoble
Sous-système
Durée du projet
2013- 2015
Description
OQA (ISA) service on an operation aiming at modifying 2 existing intersections and the creation of a 3rd intersection as well as a new urban insertion with the creation of a roadway along the tramway between the streets of the 3 districts and the poplars.
périmètre du projet
The service concerns exclusively the system and sub-system aspects during the design, installation, integration, testing and safety studies phases.
The evaluation will concern the urban insertion and the traffic light signals on the 3 crossroads as well as the roadway between the crossroads rue Dodero / rue des 3 quartiers and rue Dodero / rue des peupliers.