FRANCE: HIGH SPEED LINE EAST PHASE 1
Client
RFF
Sous-système
Durée du projet
2002 to 2008
Description
Control and signalling (ERTMS Level 2 equipment, SEI equipment, KVB, track circuits…)
Energy (voltage/frequency, interface with substations…)
Infrastructure
Structures (Covered trenches, Viaducts, station platforms, bridges,…)
Track (risk of derailment)
Interfaces with rolling stock (crosswinds, hot box detectors, etc.)
Detection equipment (fall detectors,…)
Provisions relating to the protection of the site
Operation and maintenance
périmètre du projet
Réalisations
Voir tout