BELGIUM: CERTIFICATION MISSION ACCORDING TO INTEROPERABILITY AND NATIONAL REGULATIONS

Client

Sous-système

Durée du projet

Description

A modernisation project of 67 km of railway line Hatrival – Luxembourg border that includes:

Infrastructure modernisation

  • 5 curves
  • 6 level crossing
  • 27 structures in total
  • 7 railway stations

Signalling subsystem

Signalling system modernisation and adaptation to higher trains speed

Energy subsystem

Dismantling existing catenary 3kV and construction of new overhead catenary system 25kV

périmètre du projet

NoBo Service

  • Energy: interoperability assessment of the Energy subsystem according to TSI 1301/2014
  • Infrastructure: interoperability assessment of the Infrastructure subsystem according to TSI Infra 1299/2014
  • PRM: interoperability assessment of the PRM subsystem according to TSI Energy 1300/2014

DeBo Service

  • CCS & Infrastructure : assessment of the Signalling and Infrastructure systems according to national rules
Réalisations
Voir tout
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Avez-vous un
projet ?

Avez-vous besoin d’un expert pour vous accompagner dans votre projet ferroviaire ?

Êtes-vous expert de la mobilité ?

Rejoignez notre équipe et travaillez sur des projets innovants pour faire avancer ensemble la mobilité du futur.