ALGERIA: LIGHT RAIL TRAIN OF OUARGLA

Client

EMA

Sous-système

Durée du projet

2015- 2017

Description

The first tramway line of Ouargla is 12.6 km long with 23 stations, 16 junctions, 2 park-and-ride lots and 3 interchange poles. It connects El Ksar (the old city) to the new city (Hai Nasr).

périmètre du projet

This assessment service applies to the following subsystems:

  • Global system coherence, system approach
  • Railway signalling and control,
  • Rolling stock,
  • Operation/maintenance of tramways,
  • Electrical traction energy / Traction energy substation and traction current return circuit,
  • External risks, natural and technological risks,
  • Railway track, platform and switches and crossings
  • Civil engineering-solidity
Réalisations
Voir tout
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Avez-vous un
projet ?

Avez-vous besoin d’un expert pour vous accompagner dans votre projet ferroviaire ?

Êtes-vous expert de la mobilité ?

Rejoignez notre équipe et travaillez sur des projets innovants pour faire avancer ensemble la mobilité du futur.