METRO LINES 3 AND 6 OF SANTIAGO DE CHILE

Client

METRO DE SANTIAGO

Sous-système

Global System

Durée du projet

2012 - 2018

Description

METRO DE SANTIAGO is the client and is working with different stakeholders in order to build the two new metro lines in Santiago: lines 3 and 6.

CERTIFER is in charge of the Independent Safety Assessment and Audit of the safety aspects for both lines including:

  • Global System,
  • Operation & Maintenance,
  • Command & Control & Signalling,
  • Rolling Stock,
  • Catenary,
  • Energy,
  • Tracks,
  • Platform doors,
  • Control Center,
  • Safety systems in tunnels (fire detection system, ventilation system, evacuation equipment),
  • Interfaces between subsystems,
  • Risks exported to the operator and maintainer,
  • Interfaces with Civil Engineering.

périmètre du projet

Réalisations
Voir tout
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Avez-vous un
projet ?

Avez-vous besoin d’un expert pour vous accompagner dans votre projet ferroviaire ?

Êtes-vous expert de la mobilité ?

Rejoignez notre équipe et travaillez sur des projets innovants pour faire avancer ensemble la mobilité du futur.