ALGERIA: LINE 1 OF THE ALGIERS METRO

Client

EMA (Entreprise Métro d'Alger)

Sous-système

Durée du projet

2008 - 2011

Description

The project consists of the construction of the first metro line of Algiers.

The project includes 9.5 km of line with 10 stations connecting Haï el Badr (Bourouba) to Tafourah – Grande poste (Algiers-Centre)

périmètre du projet

Certifer has carried out an OQA (Organisme Qualifié Agrée) service in the following disciplines

  • Global coherence, system approach
  • Operation of metros
  • External risks, natural risks and technological risks
  • Rolling stock
  • Command and control, railway signalling
  • Civil engineering – solidity
  • Civil engineering – fire safety, evacuation and emergency response
  • Equipment – fire safety, evacuation and emergency response
  • Platform, track and switches and crossings
  • Electrical traction energy

The main activities performed by Certifer include:

  • Quarterly reports on project progress and key risks;
  • Evaluation and follow-up of the risk analysis throughout the project (from design to commissioning);
  • Conducting audits of key suppliers and project management;
  • Completion of the final evaluation reports for each subsystem.
Réalisations
Voir tout
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Avez-vous un
projet ?

Avez-vous besoin d’un expert pour vous accompagner dans votre projet ferroviaire ?

Êtes-vous expert de la mobilité ?

Rejoignez notre équipe et travaillez sur des projets innovants pour faire avancer ensemble la mobilité du futur.