ALGERIA: ORAN TRAMWAY

Client

Entreprise Metro d'Alger (EMA)

Sous-système

Durée du projet

2007 to 2013

Description

Our Service

  • Global coherence, system approach
  • Operation of tramways
  • External risks, natural risks and technological risks
  • Command and control, railway signalling
  • Civil engineering -Solidity
  • Platform, track and switches and crossings
  • Traction energy, 11 substations including 1 in depot
  • Rolling stock: 30 Citadis 302 trainsets
  • Urban integration
  • 32 stations including 4 interconnections, cameras at intersections

CERTIFER team
1 project manager and 10 experts

périmètre du projet

Réalisations
Voir tout
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Avez-vous un
projet ?

Avez-vous besoin d’un expert pour vous accompagner dans votre projet ferroviaire ?

Êtes-vous expert de la mobilité ?

Rejoignez notre équipe et travaillez sur des projets innovants pour faire avancer ensemble la mobilité du futur.