ALGERIA: LIGHT RAIL TRAIN OF SIDI BEL ABBES
Client
EMA
Sous-système
Durée du projet
2015- 2017
Description
The first tramway line of Sidi Bel Abbès, 17.5km long, connects the « cité du 20 aout » to the « Cascade » sector.
périmètre du projet
This assessment mission applies to the following subsystems:
- Global system coherence, system approach
- Railway signalling and control,
- Rolling stock,
- Operation/maintenance of tramways,
- Electrical traction energy / Traction energy substation and traction current return circuit,
- External risks, natural and technological risks,
- Railway track, platform and switches and crossings
- Civil engineering-solidity
- Evaluation of the safety of the urban insertion with respect to third parties and users of the public space (sub-field « m »)
- Evaluation of the safety of the parameters relating to the dynamic operation of the management of intersections by means of tricolour light signals (sub-area « l »)