BELGIUM : ETCS L1 LS IMPLEMENTATION

Client

INFRABEL

Sous-système

Control, Command and Signalling

Durée du projet

06.2019 -

Description

Infrabel has developed an ETCS Masterplan, aiming at deploying ETCS step by step over the entire railway network. The ambition is to have all Belgian lines operated with ETCS by the end of 2025. By then, Infrabel must therefore equips its entire infrastructure with ETCS. The Masterplan indicates which railway line will be equipped with ETCS, and at what level. On the Belgian network, Infrabel has chosen to set up a combination of ETCS level 1 Full Supervision, ETCS level 1 Limited Supervision and ETCS level 2 Full Supervision. In March 2021, 73 km of track are equipped with ETCS Level 1 Limited Supervision.

périmètre du projet

Réalisations
Voir tout
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Avez-vous un
projet ?

Avez-vous besoin d’un expert pour vous accompagner dans votre projet ferroviaire ?

Êtes-vous expert de la mobilité ?

Rejoignez notre équipe et travaillez sur des projets innovants pour faire avancer ensemble la mobilité du futur.