BELGIUM: CERTIFICATION MISSION ACCORDING TO INTEROPERABILITY AND NATIONAL REGULATIONS
Client
Infrabel
Sous-système
Control, Command and Signalling
Durée du projet
2016-2020
Description
CERTIFER’s personnel:
1 project manager & 6 assessors
Project’s description:
modernisation project of 67 km of railway line Hatrival – Luxembourg border that includes:
Infrastructure modernisation:
- 5 curves
- 6 level crossing
- 27 structures in total
- 7 railway stations
Signalling subsystem
Signalling system modernization and adaptation to higher trains speed
Energy subsystem
Dismantling existing catenary 3kV and construction of new overhead catenary system 25kV
périmètre du projet
CERTIFER’s service
NoBo service
- Energy: interoperability assessment of the Energy subsystem according to TSI 1301/2014;
- Infrastructure: interoperability assessment of the Infrastructure subsystem according to TSI Infra 1299/2014;
- PRM: interoperability assessment of the PRM subsystem according to TSI Energy 1300/2014.
DeBo service
- CCS & Infrastructure : assessment of the Signalling and Infrastructure systems according to national rules.
Réalisations
Voir tout