FRANCE: HIGH SPEED LINE EAST PHASE 1
Kunde
RFF
Teilsystem
Dauer des Projekts
2002 to 2008
Beschreibung des Projekts
Control and signalling (ERTMS Level 2 equipment, SEI equipment, KVB, track circuits…)
Energy (voltage/frequency, interface with substations…)
Infrastructure
Structures (Covered trenches, Viaducts, station platforms, bridges,…)
Track (risk of derailment)
Interfaces with rolling stock (crosswinds, hot box detectors, etc.)
Detection equipment (fall detectors,…)
Provisions relating to the protection of the site
Operation and maintenance
Umfang der Arbeiten
Errungenschaften
Siehe alle