ALGERIA: ORAN TRAMWAY
Kunde
Entreprise Metro d'Alger (EMA)
Teilsystem
Dauer des Projekts
2007 to 2013
Beschreibung des Projekts
Our Service
- Global coherence, system approach
- Operation of tramways
- External risks, natural risks and technological risks
- Command and control, railway signalling
- Civil engineering -Solidity
- Platform, track and switches and crossings
- Traction energy, 11 substations including 1 in depot
- Rolling stock: 30 Citadis 302 trainsets
- Urban integration
- 32 stations including 4 interconnections, cameras at intersections
CERTIFER team
1 project manager and 10 experts
Umfang der Arbeiten
Errungenschaften
Siehe alle