ALGERIA: MOSTAGANEM TRAMWAY

Kunde

Entreprise Metro d'Alger

Teilsystem

Dauer des Projekts

2013 - ongoing

Beschreibung des Projekts

The first tramway line of Mostaganem, 14.2 km long, is composed of 2 sections:

  • The first section connects the „Salamandre“ sector to the „Kharouba“ sector, 12.2 km long and with 20 stations.
  • The second section connects the SNTF station to the new bus station, 2 km long and with 4 stations.

Umfang der Arbeiten

The evaluation covers the following phases:

  • Phase 1: Design of the installations and manufacturing of the equipment
  • Phase 2: Manufacturing – Installation
  • Phase 3: Tests and trials
  • Phase 4: Preparation for operation
  • Phase 5: Commissioning (Safety file)
  • Phase 5.1 Partial safety file
  • Phase 5.2: Completion of the safety file
Errungenschaften
Siehe alle
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Haben Sie ein Projekt?

Benötigen Sie fachkundige Unterstützung für Ihren Eisenbahnprojekten?

Sind Sie ein Mobilitätsexperte?

Kommen Sie in unser Team, um an innovativen Projekten zu arbeiten und die Zukunft der Mobilität gemeinsam voranzutreiben.