FRANCE: TRAMWAY GRAND AVIGNON

Kunde

TECELYS Grand Avignon

Teilsystem

Dauer des Projekts

2012 to 2016

Beschreibung des Projekts

The planned tramway line is 6 km long and its route is composed of :

  • The commercial part of about 5 km in double track from Saint Roch to Saint Chamand with 10 stations. The terminus of the line is the Saint Chamand station associated with a park and ride facility;
  • A non-commercial section of approximately 1 km allowing trains to access the Operations and Maintenance Center (CDEM). It will be a single track.

Umfang der Arbeiten

This service consists in evaluating the new tramway line of Avignon.
The evaluation concerns the following fields

  • Overall system

Global coherence, system approach
Tramway operation
External risks, natural and technological risks

  • Rolling Stock
  • Control and command and railway signalling
  • Infrastructure

Platform
Tracks and switches and crossings
Civil engineering, solidity

  • Electrical traction energy
  • Urban insertion of tramways and Lighted Traffic Signals (LTS)

Certifer team
1 project manager and 13 experts

Errungenschaften
Siehe alle
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Haben Sie ein Projekt?

Benötigen Sie fachkundige Unterstützung für Ihren Eisenbahnprojekten?

Sind Sie ein Mobilitätsexperte?

Kommen Sie in unser Team, um an innovativen Projekten zu arbeiten und die Zukunft der Mobilität gemeinsam voranzutreiben.