ALGERIA: LIGHT RAIL TRAIN OF OUARGLA
Kunde
EMA
Teilsystem
Dauer des Projekts
2015- 2017
Beschreibung des Projekts
The first tramway line of Ouargla is 12.6 km long with 23 stations, 16 junctions, 2 park-and-ride lots and 3 interchange poles. It connects El Ksar (the old city) to the new city (Hai Nasr).
Umfang der Arbeiten
This assessment service applies to the following subsystems:
- Global system coherence, system approach
- Railway signalling and control,
- Rolling stock,
- Operation/maintenance of tramways,
- Electrical traction energy / Traction energy substation and traction current return circuit,
- External risks, natural and technological risks,
- Railway track, platform and switches and crossings
- Civil engineering-solidity
Errungenschaften
Siehe alle