BELGIUM: ACCESS LINE L3 & ACCESS L4
Customer
Infrabel (ETCS)
Subsystem
Control, Command and Signalling
Duration of the project
2004 to 2009
Project's description
Certifer’s missions :
- ETCS level 1 trackside assembly with reopening function
- Coherence with adjacent ETCS level 2 trackside systems
- Integration with existing signalling system
Control of the interoperability of the signalling of the high speed lines L3 (Liège – Hammerbrùcke) and L4 (Antwerp – Frontier, Netherlands), category I lines in reference to the CC TSI. In order to study the compliance of the system behavior during Level 1 to Level 2 transitions the approach areas (about 5 km) located at the ends of L3 and L4 are part of the evaluation.
Certifer team :
1 project manager and 2 experts
Scope of work
Achievements
See all